FEBRUARY 2025 The company installs a new rail, track sightings, designed for a 25 railcar capacity, adding to a total of 50+ railcar spots on site on four rail tracks. Additionally, a new railcar transload system has been installed to transfer from rail car to truck or from truck to railcar with loading/unloading on certified truck scales.